These files show the post-Challenge Process classification (unserved, underserved, served, and Eligible Community Anchor institutions (CAIs)*) of each Broadband Serviceable Location (BSL) in California by FCC Location ID. The files reflect the results of the Challenge Process, pre-challenge modifications, and de-duplication of state and federal enforceable commitments. Applicants will be able to download BSL and map data, as well as Location IDs and a PDF of their application, through the BEAD Application Portal. Applicants are encouraged to use a combination of the datasets and final map to conceptualize project planning areas.
As of March 25, 2025, datasets reflect the following:
Fabric Version: 4
Fabric Date: December 31, 2023
National Broadband Availability Map: May 14, 2024
Federal Deduplication Date: October 1, 2024
State Deduplication Date: February 20, 2025
*The BEAD Challenge Process allowed for adding CAIs that were not previously identified as BSLs.
Please note: These CSV files may have record counts exceeding the viewable limits in Microsoft Excel and/or other applications.
These BSLs reportedly have at least one of the following:
These locations also are reported to lack enforceable commitments for deployment of service that will deliver speeds of at least 100/20 Mbps.
These locations are BSLs that are shown to have at least one of the following:
These locations are considered underserved based on the CPUC’s BEAD pre-challenge modifications (i.e., DSL modification and cellular fixed wireless modification), and are reported to lack enforceable commitments for deployment of service that will deliver speeds of at least 100/20 Mbps.
These BSLs reportedly have access to Reliable Broadband Service greater than or equal to 100/20 Mbps and latency less than or equal to 100 milliseconds or have an enforceable commitment for the deployment of service that meets those standards.
These locations will likely be funded by an enforceable commitment and will likely not be served by BEAD, but final determination of specific enforceable commitment locations is pending.
This file includes the list of Eligible Community Anchor Institution (CAI) locations.
Eligible Community Anchor Institution: Speed of not less than 1 Gbps for both downloads and uploads and latency less than or equal to 100 milliseconds.
This shapefile contains geometry of the PAU polygons as well as relevant PAU attributes.
PAU_ID: Unique PAU ID
Underserved: Count of intersecting underserved eligible locations
Unserved: Count of intersecting unserved eligible locations
TribalPAU: 1 if Tribal Area
HighNeed: 1 if LIA/DAC High Need
NPV_FTTH_Green: Estimated fiber build cost
NPV_FW_Green: Estimated fixed wireless build cost
ScorablePAU: 1 if the PAU contains an unserved or underserved eligible location.
Note: The Net Present Value (NPV) cost estimate is based on NTIA data and will have no impact on project scoring or whether a proposal will be selected for funding. Certain PAUs only contain a single eligible location. The cost estimate for PAUs with a single location is averaged based on surrounding BSLs. As such, the displayed estimated costs for single-BSL PAUs do not represent the actual NTIA projected cost and may have a significantly different value from the NTIA projected cost.